|
SAMPLE PROJECTS:
Construction/Project Management, QA/QC
Facilities A/E Services
Roads & Bridges
Towers
Stream & AO Passage
Environmental
|
|
BCE has successfully completed numerous projects all over United States, as well as internationally. Projects performed range from very small, fast track to multi-million dollar projects.Current Projects:
|
|
Audubon National Refuge Headquarters and Visitor Center: Providing project management services for a new headquaters and visitor center which is located at Audubon National Wildlife Refuge in Coleharbor, North Dakota, under the American Recovery and Reinvestment Act. |
| |
|
|
|
Navigation Review Support Services (USCG), Schedule 899: Currently obtaining navigational review support services to assist the United States Coast Guard (USCG) in determinig the navigability of waterways within the Alaskan interior. |
| |
|
|
|
Ft. Lewis Construction Inspections (US Army Corps of Engineers): Currently providing work under an IDIQ contract with US Army Corps of Engineers for construction inspection services for a series of major design/build capital improvement projects, including the construction of headquaters, several barracks with related dining facilities, stormwater detention facilities, and other supporting infrastructures, including roads and utility upgrades required to service the facilities. |
| |
|
|
|
Sitka Pioneer Home Totem Square Engineering Analysis, Sitka, AK (DHSS): Conducted evaluation and analysis of an existing historical Totem Park and seawall in Sitka and provided recommendations for upgrades and safety improvements. The Totem Square site is located in the historical area of Sitka; it is recognized as one of the sites most visited by tourists. Phase II of this project included design of the seawall and park safety and drainage improvements. |
| |
|
|
|
Moose Creek Pedestrian Bridge Design, Sutton, AK (CVTC): Provided design services for a multi-use, single lane bridge and trails to improve access to a recreational area near Moose Creek. The bridge spans 70 feet across high flow and high energy creek. The design considered public safety, environmental and stream restoration, and improvements to fish and wildlife passage. The new bridge allows for historic access to public lands and eliminated negative impacts of existing vehicle crossing on salmon habitat. |
| |
|
|
|
Elizabeth Peratrovich Vocational Center, Petersburg, AK (Petersburg Indian Association): Providing interior space planning and analysis of the existing building to develop design for the proposed vocational school. BCE provided detailed design and preparation of plans and specifications, as well as construction document set. |
| |
|
|
|
Seldovia Fish Passage Feasibility Study (Seldovia Village Tribe): Conducting site reconnaissance and survey to evaluate the potential for improving the site for fish passage, as well as hydrologic analysis, flow measurements, geotechnical investigation, channel geomorphology and bedrock evaluation, coordination with on-going habitat evaluation. |
| |
|
|
|
Expert Witness Services: Providing expert witness services for a private client which include document review, analysis of the facts, trial preparation, and expert witness testimony. |
|